In this project, MHO undertook a redesign of a telescopic shiploading chute at a coal terminal to suit a new replacement shiploader boom section. The brief was to produce a design with reduced weight in the complete blocked chute load case. The initial weight reduction of circa 4 tonnes. Assessment of the existing boom feed chute flow path at higher flow rates was also carried out.
The solution MHO created included an optimised head chute, tilt component, telescopic chute sections, rotation component, transition section, and trimming spoon.
The scope included design and manufacture of the system and transport cradle, including electrical, controls, and FAT.