head and telescopic chute

Renders

Manufacturing

This project addressed a problematic head chute and telescopic chute in a stockpiling application at a mine in Central Queensland. The issues to overcome were that a) the existing head chute arrangement had an uneven material discharge path into the telescopic chute below, causing material degradation and biased wear in the upper telescope section, and b) the telescopic chute also had significant clearance between segments, making it prone to dust leakage, material buildup and jamming.

To resolve these issues, MHO replaced the existing head chute and deflector with an inlet hood and snoot combination designed to create a centralised vertical exit stream. In combination with a sealed gimbal section, this new configuration ensures the material has a central discharge into the smaller diameter telescopic chute. Correcting the off-centre alignment and improving material flow. Moving the discharge stream back towards the head pulley allows for enhanced design options, such as steeper fines tray angles and better access for maintenance of primary and secondary cleaners.

Additionally, this design modification enables the use of smaller diameter unlined tubes, which reduces weight and costs while minimising blocked chute loads. At full rates, the new arrangement prevents induced airflow into the telescopic chute below, reducing respirable dust. This innovative approach aligns with successful techniques employed by MHO Infrastructure in previous shiploader tube arrangements, resulting in a functional and effective lightweight robust design solution.

Installation

Previous
Previous

Feed Chute System

Next
Next

Shiploader Telescopic Chute