Chute Diversion System
Renders
Manufacturing
This project involved the replacement of two separate two-way transfer systems in a coal port in-loading distribution tower. The original systems had reached the end of life, and rather than replace them with like-for-like, the client took the opportunity to make a range of improvements, including incorporating online switching and splitting capabilities. Although a brownfield application, MHO was able to design new systems that met customer requirements within the existing constraints, installing them without incident. Both systems exceeded throughput design criteria during initial performance testing.
The improved material flow-paths and component geometry avoid long free-fall sections and high impingement angles to reduce wear, material degradation, dust generation, and noise.
Control of material velocity and direction throughout the transfer process produces even and central soft loading and discharge velocities the same as receiving belt speeds.
Improved sealing and covers around shafts, belt cleaner penetrations and between components mitigates the dust leakage, and spillage generated during loaded stop / start events.
The replacement systems have improved access for inspection, maintenance, and cleaning. Upper head chute flanged connections allow for pulley changeouts, and dowelled flange connections ensure correct internal wear liner surface alignment.
Both systems incorporate actuated diverters and are capable of online switching between two routes and proportional online splitting between the two routes. This provides the flexibility to avoid the time lost starting and stopping belts for a route change when unloading a train, and in some circumstances, double-handling a proportion of material.